Waypoint works with leaders who need a clear view of delivery risk, progress and readiness across complex SAP programs.
We can stay close across the life of the program as an assurance partner, or be brought in at critical points when a focused review is needed.
Our role is to help you see what is really happening, what needs attention, and what should happen next.
Complex programs do not fail all at once. They drift through small decisions, unresolved risks, weak signals and assumptions that are allowed to sit for too long.
An independent view helps leaders test whether the program is as healthy as it looks, whether the evidence supports the confidence being reported, and whether the right issues are getting attention early enough.
Waypoint sits close enough to understand the delivery reality, but separate enough to call it clearly.
A tool can read a status report. It cannot sit across the table from the person who has to answer for the program and say the thing nobody in the room wants to say.
Most clients keep us close across the life of a program as an independent assurance partner. Others bring us in for a focused review at a single point. Either way, here is where an independent view earns its place.
Brought in at a specific point. A scope decision, phase gate, delivery health check, recovery point, or go live readiness review.
A senior independent view across the life of the program, at the points that matter, without becoming part of the delivery team.
The situations we are most often brought into.
The status is amber. Nothing yet demands action, but your confidence has shifted.
A scope or statement of work is being shaped or ready to sign.
A phase gate, design decision, readiness point or go live call.
It has slipped again and the reviews keep missing the cause.
At the start of something large, we help set the program up so it holds once the pressure arrives.
These are drawn from real programs. Three times the obvious explanation was wrong, and what it took to see it.
Everyone decided the offshore team was the problem. Too little output, the usual call. I went and spent time with them instead. They were capable and working hard. They had just lost sight of why the work mattered. I gave them that back, and throughput followed.
The throughput issue was real. The reason behind it was not what people assumed.
The System Integration Testing cycles kept slipping, and everyone wanted testing to move faster. Testing was not the problem. Defects were being fixed too slowly, and the work had no real cadence. We fixed that, and the cycles held.
The slipping test cycles were simply where the problem became visible.
Most programs stand up a PMO and then spend weeks deciding how it should run. I built the standard first. The methodology, the templates, the way the work would run, all ready before the program got moving.
When the program accelerated, the PMO did not need to work out how to function.